{"id":3835,"date":"2026-11-05T08:00:00","date_gmt":"2026-11-05T08:00:00","guid":{"rendered":"https:\/\/mingyumachines.com\/?p=3835"},"modified":"2026-11-05T08:00:00","modified_gmt":"2026-11-05T08:00:00","slug":"wz25e-work-planning-park-utility-repairs","status":"publish","type":"post","link":"https:\/\/mingyumachines.com\/id\/wz25e-work-planning-park-utility-repairs\/","title":{"rendered":"WZ25E Work Planning for Park and Utility Repair Teams"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Daftar Isi<\/h2><nav><ul><li class=\"\"><a href=\"#section-1\">Start WZ25E work planning with the repair sequence<\/a><\/li><li class=\"\"><a href=\"#section-2\">Separate the two functions in WZ25E work planning<\/a><\/li><li class=\"\"><a href=\"#section-3\">Use the published WZ25E values with their original labels<\/a><\/li><li class=\"\"><a href=\"#section-4\">Check material mass before planning the front bucket cycles<\/a><\/li><li class=\"\"><a href=\"#section-5\">Draw the excavation for WZ25E work planning<\/a><\/li><li class=\"\"><a href=\"#section-6\">Plan access for setup as well as travel<\/a><\/li><li class=\"\"><a href=\"#section-7\">Build charging into WZ25E work planning<\/a><\/li><li class=\"\"><a href=\"#section-8\">Measure a complete repair rather than one fast cycle<\/a><\/li><li class=\"\"><a href=\"#section-9\">Compare one multi-purpose machine with split resources<\/a><\/li><li class=\"\"><a href=\"#section-10\">Finish WZ25E work planning with a clear supply record<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Pertanyaan yang sering diajukan<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-1\">Start WZ25E work planning with the repair sequence<\/h2>\n\n\n<p class=\"wp-block-paragraph\">A park or utility maintenance team often needs to open a short section, move the excavated material, bring in replacement material and restore the surface. WZ25E work planning should describe that sequence before comparing equipment. One electric backhoe loader may serve several stages, but each stage needs a suitable working position and equipment envelope. The advantage of combining functions depends on how often the operator must reposition, change tools or wait for another crew.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Use a real recurring repair as the reference job. Record the excavation dimensions, spoil location, material receiving point and access restrictions. Separate the work the machine must perform from work assigned to other equipment or people. The WZ25E product page supplies several useful dimensions and ratings, while some labels need clarification. A sound selection enquiry makes those unresolved details visible instead of treating every listed number as an approved operating limit.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4.jpg\" alt=\"Electric Backhoe Loader WZ25E product view \u2014 WZ25E work planning assessment\" class=\"wp-image-2962\" srcset=\"https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4.jpg 800w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-600x600.jpg 600w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-100x100.jpg 100w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-300x300.jpg 300w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-150x150.jpg 150w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-768x768.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-2\">Separate the two functions in WZ25E work planning<\/h2>\n\n\n<p class=\"wp-block-paragraph\">For WZ25E work planning, draw the front loading task separately from the excavation task. The front operation includes collecting material, carrying it along the permitted route and discharging it at a receiving point. The rear operation involves a standing position, an excavation shape and a spoil-placement area. Capacity or clearance that appears suitable for one function does not establish suitability for the other.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Map the transitions in WZ25E work planning between the two operations. If the loader must repeatedly leave the excavation area to move spoil, record that movement as part of the job rather than counting only productive bucket cycles. A separate spoil vehicle or a different material staging arrangement may improve the overall sequence. Compare the complete repair time and required resources, including inspection and setup, before assuming that one multi-purpose machine always removes the need for supporting equipment.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-3\">Use the published WZ25E values with their original labels<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The published WZ25E table lists 4,200 kg operating weight, 1,000 kg rated load, a lithium-battery specification of 153.6 V and 206 Ah, and dimensions written as 5,600 \u00d7 1,950 \u00d7 2,750. The dimension row does not include a visible unit in the captured table. The bucket row gives 0.45 flat bucket and 0.6 full bucket without a unit. WZ25E work planning therefore needs a dated drawing and a clear definition of the bucket-volume measurement basis.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Two discharge-related rows also need attention. One is labelled Dumping height with a value of 3300 and no stated unit, while another says Dumping Height at 2635 mm. The table does not clearly assign those two values to the front and rear mechanisms. Likewise, a row labelled Loader Digging Depth gives 2360 mm. Ask MINGYU to identify the relevant mechanism and measurement points. Do not relabel these values yourself simply because one interpretation seems mechanically plausible.<\/p>\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Captured parameter<\/th><th>Published value<\/th><th>Confirmation needed<\/th><\/tr><\/thead><tbody><tr><td>Beban terukur<\/td><td>1,000 kg<\/td><td>Applicable mechanism and configuration<\/td><\/tr><tr><td>Berat operasi<\/td><td>4,200 kg<\/td><td>Included supplied equipment<\/td><\/tr><tr><td>Battery capacity<\/td><td>153.6 V \/ 206 Ah<\/td><td>Actual battery and charger identities<\/td><\/tr><tr><td>Bucket capacity<\/td><td>0.45 flat \/ 0.6 full<\/td><td>Unit and measurement basis<\/td><\/tr><tr><td>Dumping height, first row<\/td><td>3300, unit not shown<\/td><td>Mechanism, unit and reference points<\/td><\/tr><tr><td>Dumping height, second row<\/td><td>2,635 mm<\/td><td>Mechanism and discharge geometry<\/td><\/tr><tr><td>Loader digging depth<\/td><td>2,360 mm<\/td><td>Correct mechanism and working-envelope drawing<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-4\">Check material mass before planning the front bucket cycles<\/h2>\n\n\n<p class=\"wp-block-paragraph\">WZ25E work planning should use the actual material condition. Soil, aggregates and replacement fill can change in density and moisture. Obtain a representative mass or bulk-density measurement and confirm the supplied bucket volume before calculating a batch. A visual impression of a full bucket cannot establish material mass, and the published rated load still needs its applicable configuration and conditions.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For a WZ25E work planning illustration only, suppose the supplier confirms a working material volume of 0.45 m\u00b3 and a measured material density is 1,600 kg\/m\u00b3. Their product is 720 kg before considering whether that volume and material are suitable for the approved operation. Those inputs are hypothetical and do not establish a WZ25E payload. If a different material produces an excessive result, revise the approved loading method or select another configuration. Do not rely on the apparent spare space in the bucket.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-5\">Draw the excavation for WZ25E work planning<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The excavation sketch should show length, width, depth, nearby structures and the place where spoil will be deposited. WZ25E work planning must connect that sketch with the manufacturer-confirmed working envelope. Maximum digging height is listed at 3,665 mm, but that single boundary does not describe the reach available at the required depth or the space needed to move the rear equipment.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Include the standing area and any configuration-dependent setup requirements. Have the site team assess the excavation, underground services and surrounding ground through the appropriate local process. Request the operating instructions and envelope drawing for the exact quoted equipment. A machine&#x27;s ability to reach a point geometrically does not establish a safe excavation or a suitable ground position. Keep these assessments together in the job file while retaining their distinct purposes.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"1400\" height=\"2122\" src=\"https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight.jpg\" alt=\"Electric Backhoe Loader WZ25E additional product view\" class=\"wp-image-2264\" srcset=\"https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight.jpg 1400w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight-800x1213.jpg 800w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight-198x300.jpg 198w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight-676x1024.jpg 676w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight-768x1164.jpg 768w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight-1013x1536.jpg 1013w, https:\/\/mingyumachines.com\/wp-content\/uploads\/2026\/08\/Electric-backhoe-loader-WZ25E-4-detail-tight-1351x2048.jpg 1351w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-6\">Plan access for setup as well as travel<\/h2>\n\n\n<p class=\"wp-block-paragraph\">A compact approach route can lead to a work area that lacks room for deployment or material storage. WZ25E work planning should show the machine&#x27;s travelling envelope, the work envelope and the movements needed to leave the site. Confirm the units and attachment condition for the published dimensions before using them in a route assessment. Include overhead branches, gates, parked vehicles, drains and public access where relevant.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Measure storage and receiving areas at the same time. If spoil, replacement fill or removed surface material occupies the machine&#x27;s setup space, the repair sequence can become impossible even though the initial access route was clear. Assign a location and an owner for every temporary material stock. Where pedestrian access or other work changes during the day, make the necessary route-control arrangements part of the operating plan rather than an informal assumption.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-7\">Build charging into WZ25E work planning<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The listed 153.6 V and 206 Ah values give nominal nameplate energy of 153.6 \u00d7 206 \u00f7 1,000 = 31.6416 kWh. WZ25E work planning must not turn that arithmetic into a runtime promise. The usable battery energy, reserve and charging restrictions require confirmation for the supplied battery system. Loading, excavation, travel and waiting can produce different patterns of demand.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Record how much time the reference repair spends in each mode and when the machine can reach the charger. Ask for charger input, phase, frequency, connection and installation requirements, then have the site supply checked by a qualified electrician. A scheduled break is useful only if the permitted charging practice and the actual site arrangement support it. Include a plan for finishing or safely suspending a job when the next charging opportunity is delayed.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-8\">Measure a complete repair rather than one fast cycle<\/h2>\n\n\n<p class=\"wp-block-paragraph\">A demonstration for WZ25E work planning should reproduce the normal sequence: preparation, excavation, spoil management, loading or replacement-material movement and departure. Have competent personnel agree the test method and operating arrangements. Record attachment changes, repositioning and ordinary waiting separately. This shows whether a multi-purpose configuration is useful for the team&#x27;s real work rather than only attractive during an unrestricted demonstration.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For an illustrative WZ25E work planning quantity check, a repair excavation 8 m long, 0.5 m wide and 0.8 m deep contains 3.2 m\u00b3 in situ. That calculation excludes overbreak and material expansion after excavation. It does not predict the WZ25E cycle count or completion time. Compare the geometric quantity with measured work and the permitted task. Retain the conditions with the results so later productivity and energy estimates refer to the same kind of repair.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-9\">Compare one multi-purpose machine with split resources<\/h2>\n\n\n<p class=\"wp-block-paragraph\">WZ25E work planning becomes more useful when the team compares alternative work arrangements. One machine may reduce transport or fleet requirements, but it can only perform one task at a time. Separate machines may allow excavation and material movement to overlap, while introducing their own transport, staffing and site-space needs. Compare the actual resource sequence and work calendar rather than assuming either arrangement is always more efficient.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Use the WZ25E work planning table as a discussion framework, with local measured inputs added later. Any cost comparison should include mobilisation, productive time, setup, energy, attachments and maintenance support on a common basis. If the intended job volume is uncertain, test lower utilisation as well as the expected workload. A configuration that fits recurring park repairs may still be unsuitable for an occasional deeper or more demanding utility excavation.<\/p>\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Planning question<\/th><th>One WZ25E configuration<\/th><th>Separate equipment<\/th><\/tr><\/thead><tbody><tr><td>Task overlap<\/td><td>Loading and excavation must be sequenced<\/td><td>Overlap may be possible if site and staffing permit<\/td><\/tr><tr><td>Mobilisation<\/td><td>Confirm one-machine transport and attachment package<\/td><td>Assess each machine and delivery<\/td><\/tr><tr><td>Space at the repair<\/td><td>Allow both work envelopes over time<\/td><td>Allow simultaneous equipment and traffic<\/td><\/tr><tr><td>Energy or fuel<\/td><td>Measure the actual electric duty cycle<\/td><td>Measure each resource on the same work basis<\/td><\/tr><tr><td>Decision evidence<\/td><td>Complete repair trial and confirmed configuration<\/td><td>Equivalent complete-task comparison<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"section-10\">Finish WZ25E work planning with a clear supply record<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Request a quotation that resolves the table-label questions and identifies the exact bucket, rear equipment, battery and charger. Supply the repair sketch, materials, access layout, shift pattern, electrical supply and destination. Ask for the relevant operating documentation, packing drawing, spare-part identification and support arrangements. WZ25E work planning should end with a configuration that the operations team can recognise and assess, rather than a model name attached to an incomplete list of assumptions.<\/p>\n\n\n<p class=\"wp-block-paragraph\">At handover, compare the machine and supplied documents with that record. Retain initial condition photographs and the commissioning results. Assign responsibility for inspection, charging and reporting a fault. If the attachment, work depth, material or route changes, reopen the relevant parts of the assessment. This keeps later jobs tied to the confirmed equipment and instructions while giving MINGYU useful information when further selection or technical support is needed.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Explore the <a href=\"https:\/\/mingyumachines.com\/id\/produk\/electric-backhoe-loader-wz25e\/\">WZ25E backhoe loader specifications<\/a>, the <a href=\"https:\/\/mingyumachines.com\/id\/product-category\/backhoe-loader\/\">rentang backhoe loader<\/a> and <a href=\"https:\/\/mingyumachines.com\/id\/dukungan-layanan\/\">Layanan dan dukungan MINGYU<\/a>. Untuk perencanaan tempat kerja yang lebih luas, merujuk pada <a href=\"https:\/\/www.hse.gov.uk\/construction\/safetytopics\/excavations.htm\" target=\"_blank\" rel=\"noopener\">pedoman resmi yang relevan<\/a> di samping instruksi mesin dan persyaratan lokal yang berlaku.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Send MINGYU your recurring repair sketch, material information, access layout, charging supply and destination. Request a WZ25E configuration quotation that clarifies the published dimension and digging labels and includes the relevant operating and charging documents.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Pertanyaan yang sering diajukan<\/h2>\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"my-0015-faq-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should WZ25E work planning cover first?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Start with the complete repair sequence and separate the front loading task from the rear excavation. Record material, receiving geometry, excavation shape, setup area, access and charging opportunities before comparing equipment.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"my-0015-faq-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which WZ25E dumping height should be used?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The captured page has two dumping-height rows with different values and incomplete mechanism labels. Ask MINGYU for the relevant drawing, units and reference points rather than assigning one value to a mechanism yourself.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"my-0015-faq-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does the battery specification establish runtime?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The 153.6 V\/206 Ah figures give 31.6416 kWh nominal nameplate energy. Usable energy, charging restrictions and representative consumption must be confirmed before estimating a working period.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"my-0015-faq-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can the listed digging-depth row be treated as a rear operating limit?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The captured label says Loader Digging Depth at 2,360 mm. Its intended mechanism needs confirmation. Use the configuration-specific operating information and working-envelope drawing for the proposed excavation.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"my-0015-faq-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">When is a combined machine worth considering?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>WZ25E work planning should compare recurring jobs, task sequencing, mobilisation and support requirements with split resources. A complete-task trial and common cost scope provide better evidence than isolated fast bucket cycles.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2\u76d8<\/legend><input type='hidden' name='__fluent_form_embded_post_id' value='3835' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"8f761270b0\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/id\/wp-json\/wp\/v2\/posts\/3835\" \/><div data-name=\"ff_cn_id_1\"  class='ff-t-container ff-column-container ff_columns_total_1'><div class='ff-t-cell ff-t-column-1' style='flex-basis: 100%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"Nama\">Nama<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nama\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><\/div><\/div><div data-name=\"ff_cn_id_2\"  class='ff-t-container ff-column-container ff_columns_total_2'><div class='ff-t-cell ff-t-column-1' style='flex-basis: 50%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email_2' id='label_ff_3_email_2' aria-label=\"Email\">Email<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email_2\" id=\"ff_3_email_2\" class=\"ff-el-form-control\" placeholder=\"Alamat Email\" data-name=\"email_2\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><\/div><div class='ff-t-cell ff-t-column-2' style='flex-basis: 50%;'><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_input_text_1' id='label_ff_3_input_text_1' aria-label=\"Produk yang berminat\">Produk yang berminat<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text_1\" class=\"ff-el-form-control\" placeholder=\"Produk yang berminat\" data-name=\"input_text_1\" id=\"ff_3_input_text_1\"  aria-invalid=\"false\" aria-required=\"false\"><\/div><\/div><\/div><\/div><div data-name=\"ff_cn_id_3\"  class='ff-t-container ff-column-container ff_columns_total_2'><div class='ff-t-cell ff-t-column-1' style='flex-basis: 50%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text_2' id='label_ff_3_input_text_2' aria-label=\"Nama perusahaan Anda\">Nama perusahaan Anda<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text_2\" class=\"ff-el-form-control\" placeholder=\"Nama perusahaan Anda\" data-name=\"input_text_2\" id=\"ff_3_input_text_2\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><\/div><div class='ff-t-cell ff-t-column-2' style='flex-basis: 50%;'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"Phone\">Phone<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"Phone\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"Information\">Information<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"Information\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Kirim Formulir\">Kirim Formulir<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"id\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/mingyumachines.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email_2\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"input_text_1\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"input_text_2\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>WZ25E work planning for park and utility repairs: review front loading, excavation geometry, site access and charging before requesting a configuration.<\/p>","protected":false},"author":1,"featured_media":2962,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"WZ25E Work Planning for Park and Utility Repairs","rank_math_description":"WZ25E work planning for park and utility repairs: review front loading, excavation geometry, site access and charging before requesting a configuration.","rank_math_canonical_url":"https:\/\/mingyumachines.com\/wz25e-work-planning-park-utility-repairs\/","rank_math_focus_keyword":"WZ25E work planning"},"categories":[41,22],"tags":[],"class_list":["post-3835","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-backhoe-loader","category-news"],"_links":{"self":[{"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/posts\/3835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/comments?post=3835"}],"version-history":[{"count":1,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/posts\/3835\/revisions"}],"predecessor-version":[{"id":4351,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/posts\/3835\/revisions\/4351"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/media\/2962"}],"wp:attachment":[{"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/media?parent=3835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/categories?post=3835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mingyumachines.com\/id\/wp-json\/wp\/v2\/tags?post=3835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}